May 09, 2013
Sellwood Bridge traffic alert for May 10
Sellwood Bridge traffic alert for May 10
Open gallery
<picture class="lw_image"> <source type="image/webp" srcset="/live/image/gid/220/width/1000/37940_sellwood.rev.1373935535.jpeg 1x"/> <source type="image/jpeg" srcset="/live/image/gid/220/width/1000/37940_sellwood.rev.1373935535.jpeg 1x"/> <img src="/live/image/gid/220/width/1000/37940_sellwood.rev.1373935535.jpeg" width="280" height="180" alt="" data-max-w="280" data-max-h="180"/></picture>
Flaggers will direct traffic at the west end of the Sellwood Bridge on Friday, May 10 between 9 a.m. and about 2 p.m. while the bridge contractor installs concrete barricades along SE Tacoma St. between SE 6th Ave. and the west end of the bridge. Installation of the barricades will require a single lane closure at times, with flaggers directing two-way traffic in the open lane. Bridge users can avoid delays by using an alternate route such as the Ross Island Bridge.
More The Source Stories
email source@lclark.edu